leopold kessler
design for the abutment at the small power station in allhartsberg
The intervention for the transition from the earthen bank to the connecting bridge structure envisaged a Cola machine at each of the two ends of a bridge that no longer exists. When a drink was requested on one side by pressing a button it would have appeared on the far side. The project was not realised.
>
project not realised